BackEmbassy Suites, Berkeley Heights, NJ
-
Details:52,671 square feet of SlenderWall panels with R-21 closed-cell foam insulation.
-
Finish: Two-tone light and dark tan colored acid-washed precast concrete panels.
-
Architect:PFVS Architecture
-
Owner:Connell Hospitaility
-
Contractor:Tocci Construction
Low maintenance and long-term value
The Embassy Suites in Berkeley Heights is being constructed with 396 smooth acid-finished panels, for a total of 52,671 square feet of precast architectural panels. The 187,000-square-foot development is located within the Connell Corporate Park and will result in an eight-story, 176-room hotel at a total project cost of $39.5 million.
"By using SlenderWall and its cost-effective combination of durable architectural precast concrete, stud wall framing, and closed-cell spray foam insulation integral to the panel," said Chris Grogan, Business Development Manager, Smith-Midland, "the project was able to reduce both the on-site trade work required and the overall project schedule."
Read the full case study article: Fourth Generation Developer depends on SlenderWall for Keystone Building in their Namesake Project.
"We are glad that hotel owners see the benefit of using a long-lasting, durable skin for their projects," said Matthew Smith, Smith-Midland’s Vice President. "Their headaches with maintenance and replacing exteriors will go away."